Transforming
Property

Curtin University Teaching and Learning Spaces Stage 3

A collaborative space for students

SHAPE was appointed to deliver Curtin University’s foyer upgrade to Building 405. The university wanted to maximise and improve the existing space and rollout a refurbishment that would encourage staff and students to use the space more often and for longer. As all the teaching rooms had been recently refurbished by SHAPE, the foyer area needed to be revitalised to match the contemporary learning environment.

Client: Curtin University

Floor Area: 250 m²

Delivery Model: Lump Sum

Location: Perth

State: WA

Project type: Refurbishment

Completion date: February 2015

Duration: 8 weeks

Architect: Hassell

Engineers: Best Consultants

Sector: Education

Download Project Profile(0.52 MB)
Get Adobe Flash player

shapegroup.com.au requires you to download the latest version of Adobe® Flash Player.

  1. Write your message within 130 characters.