Transforming
Property

Aurizon

New fitout encourages collaborative working for Aurizon

SHAPE was engaged by Aurizon under a construction management agreement to complete the integrated base build upgrade and fitout of Level 2, 3 and 4 at 175 Eagle Street. The scope included a fitout of general office space, with a new interconnecting staircase, as well as the main reception and conference centre which included high level finishes, access flooring and detailed services coordination. The client needed SHAPE  to demonstrate safety, integrity, and leadership over the life of the project, delivering a high class, functional finished product.

Client: Aurizon

Floor Area: 2,800 m²

Delivery Model: Construction Management

Location: Brisbane

State: QLD

Project type: Fitout

Completion date: March 2013

Duration: 10 weeks

Architect: IDC Design

Engineers: Aurecon

Sector: Office

Download Project Profile(0.81 MB)
Get Adobe Flash player

shapegroup.com.au requires you to download the latest version of Adobe® Flash Player.

  1. Write your message within 130 characters.