Transforming
Property

TIO Palmerston

Critical timeframe successfully met

SHAPE was engaged by TIO to reconfigure the existing retail bank tenancy. The refurbishment took place while the bank was still operational and involved four different stages. The key client value was to ensure that there was no disruption to the branch operations while works took place.

Client: TIO

Floor Area: 160 m²

Delivery Model: Lump sum

Location: Darwin

State: NT

Project type: Refurbishment

Completion date: August 2014

Duration: 8 weeks

Architect: Platt Consultants

Sector: Retail

Download Project Profile(0.94 MB)
Get Adobe Flash player

shapegroup.com.au requires you to download the latest version of Adobe® Flash Player.

  1. Write your message within 130 characters.