Transforming
Property

NBN TAND 4 Wangara 

Working with NBN to maintain Australia’s nationwide internet infrastructure 

Part of a nationwide project, NBN engaged SHAPE to deliver upgrades to their network module in Perth. Construction work included the delivery of a concrete slab base, structural steel framing, speed panel walls, a suspended concrete slab for the roof structure, air conditioning units, a battery system module and gas air suppression module. Construction work was delivered with strict security protocols in place and without any outages or contamination of the network module; ensuring ongoing supply of fast broadband at affordable prices to everyday Australians. 

Client: NBN

Floor Area: 168 m²

Delivery Model: Lump Sum

Location: Perth

State: WA

Project type: Refurbishment, Technology, Government

Completion date: November 2016

Duration: 4 months

Architect: Green Box

Project Managers: Area 3

Engineers: NDY

Sector: Specialty Government

Download Project Profile(1.16 MB)
Get Adobe Flash player

shapegroup.com.au requires you to download the latest version of Adobe® Flash Player.

  1. Write your message within 130 characters.